Metrolink is the largest light rail network in the UK. Continuously growing and evolving since first opening in 1992. The network consists of sections of fully segregated and converted heavy rail lines, as well as significant areas of on-street running, where trams share the road space with road traffic and pedestrians.
From the opening of the MediaCityUK spur in 2010 to the opening of the Trafford Park Line in early 2021, TfGM will have invested approximately £2 billion in the network; this is the largest recent investment in public transport infrastructure anywhere in the UK, outside London.
Metrolink is the UK’s largest light rail network, with 99 stops across eight lines. Approximately 7.2 million miles are ‘clocked up’ across the network each year by our fleet of 147 trams, which currently cater for more than 41m journeys.
If you are up for the challenge and want to be part of a truly great team, come, and take a look at the roles we are currently recruiting for.